Canfor Pulp - prince george mill - power boiler
challenge:
Existing wood waste boiler had only a mechanical collector, which was inadequate to meet new emission standards.
Southern Environmental's Solution:
SEI provided a new state-of-the-art ESP utilizing SEI's S3 Synergy ESP Technology which included the SEI/ELEX Rigid Discharge Electrodes, PowerPlus Switch-more technology and wide CE spacing.
Project Duration:
P.O. Received 4/26/2011
Materials delivered to site by 5/15/12
Start-up scheduled for 11/15/13
Detailed Engineering in the following disciplines:
Structural
Mechanical
Electrical
Model Study
Fabrication and Construction Services:
ESP Fabrication
Field Technical Support
Scope of Work:
SEI provided detailed engineering, material supply, fabrication, construction management and 1/12 physical model study, inlet flange to stack, and slide plates to weather enclosure. The ESP is a single chamber, 3 mechanical fields and six electrical fields in direction of gas flow.
Emissions Guarantee:
0.0218 grains/dscf