Canfor Pulp - prince george mill - power boiler

challenge:

Existing wood waste boiler had only a mechanical collector, which was inadequate to meet new emission standards.

Southern Environmental's Solution:

SEI provided a new state-of-the-art ESP utilizing SEI's S3 Synergy ESP Technology which included the SEI/ELEX Rigid Discharge Electrodes, PowerPlus Switch-more technology and wide CE spacing.

Project Duration: 

  • P.O. Received 4/26/2011

  • Materials delivered to site by 5/15/12

  • Start-up scheduled for 11/15/13

     

Detailed Engineering in the following disciplines:

  • Structural

  • Mechanical

  • Electrical

  • Model Study

     

Fabrication and Construction Services:

  • ESP Fabrication

  • Field Technical Support

Scope of Work:

SEI provided detailed engineering, material supply, fabrication, construction management and 1/12 physical model study, inlet flange to stack, and slide plates to weather enclosure.  The ESP is a single chamber, 3 mechanical fields and six electrical fields in direction of gas flow.


Emissions Guarantee:

  • 0.0218 grains/dscf