Weyerhaeuser - Pine Hill, AL
Scope of work:
Southern Environmental, Inc. provided detailed engineering, material supply, fabrication, construction management, a 1/12 scale physical model study, electrical wiring, foundation, field construction, insulation and lagging, and start-up services for the Pine Hill Power Boiler Upgrade on Unit 2.
Detailed Engineering in the following disciplines:
Structural
Mechanical
Electrical
Civil
1/12 Physical Scale Model Study
Fabrication and Construction Services:
Auger type piles installation
Foundation installation
Structural steel fabrication and erection
ESP Fabrication and erection
Electrical construction
Ductwork fabrication and erection
Project Management
Site Management
Equipment:
Wood Chip Fired Boiler Unit Number 2 Upgrade
OEM Southern Environmental, Inc.
.