Scope of work: 

Southern Environmental, Inc. provided detailed engineering, material supply, fabrication, construction management, a 1/12 scale physical model study, electrical wiring, foundation, field construction, insulation and lagging, and start-up services for the Pine Hill Power Boiler Upgrade on Unit 2.

Detailed Engineering in the following disciplines:

  • Structural

  • Mechanical

  • Electrical

  • Civil

  • 1/12 Physical Scale Model Study

 

Fabrication and Construction Services:

  • Auger type piles installation

  • Foundation installation

  • Structural steel fabrication and erection

  • ESP Fabrication and erection

  • Electrical construction

  • Ductwork fabrication and erection

  • Project Management

  • Site Management


Equipment:

  • Wood Chip Fired Boiler Unit Number 2 Upgrade